Bridge closure

We’re starting the construction of the West Montrose Covered Bridge rehabilitation! The Bridge will be closed starting Aug 11, 2025 until the end of December 2026. Follow along for updates! Get the full details at www.regionofwaterloo.ca/west-montrose-covered-bridge

Thanks for the info Carla!

The plan I had heard was that the bridge would be open to bikes and pedestrians during the construction. I guess the plan changed. :frowning:

It is good that the bridge is being rehabilitated. It is unfortunately that the detour is Line 86. This will wipe out many Rec Gravel routes on the east side. Too bad the region couldn’t have helped fund the restoration of Peel street bridge or a bridge over the grand for G2G before the work on the covered bridge.